Current Projects
- Floors: Level 2
- Start Date: September 2021
- Est. End Date: December 2021
A new Help Desk for the Science/Engineering department will be created on Level 2 in this space. The individual study desks will be moved to another location and the shelf for featured books will be moved down the wall toward the door showing at the right of the photo.
- Floors: Level 3
- Start Date: September 2021
- Est. End Date: December 2021
A suspended ceiling with standard tiles and LED lights will replace the existing ceiling and fluorescent lighting above the Snack Zone. Access through the area will be maintained throughout the project.
- Floors: Level 3
- Start Date: April 2021
- Est. End Date: October 2021
When this project is complete, the Learning Commons will include both the northeast side (this project) and the northwest side of Level 3.
- Floors: Level 1
- Start Date: June 2021
- Est. End Date: September 2021
An alcove in the Social Sciences area on Level 1 that used to have rental lockers is being converted into three fully-enclosed, sound-proof single-user study rooms.
- Floors: Level 2
- Start Date: August 2020
- Est. End Date: November 2021
We brightened up and improved the aesthetics of a student study area on Level 2. The project will be complete when the furniture has been replaced.
Recently Completed
- Floors: Level 3
- Start Date: May 2021
- Est. End Date: September 2021
Approval has been given for a café to be created in this space in conjunction with BYU Dining Services. Until that can happen, it is was remodeled into student study space. While the Snack Zone on Level 3 undergoes a ceiling replacement, the furniture from that space has been relocated to this space.
- Floors: Level 2
- Start Date: July 2021
- Est. End Date: September 2021
A frame of cherry was added to the ceiling and the lighting was enhanced to be a faux skylight above the Help Desk.
- Floors: Level 3
- Start Date: July 2020
- Est. End Date: October 2020
Five offices have been built in the First Year Experience area. The area outside of the offices will have new furniture to create a welcoming atmosphere for our first year students.
- Floors: Level 2
- Start Date: October 2019
- Est. End Date: February 2020
Complete demolition of Facilities and Receiving department made way for a new Stacks management space, new Facilities offices, new mail and supply rooms, and a better layout for the consolidated Book Repair and Conservation lab.
Projects by Status
Projects By Objective
- Bring library departments together in one physical location when possible (2)
- Create new study space for students and patrons (5)
- Enhance the flexibility of space where possible through design and furnishings (5)
- Free up naturally lit spaces on perimeter for patron seating (2)
- Improve employee workspace (3)
- Improve line of sight (5)
- Improve student study space (3)
- Organize space in a logical and consistent fashion (4)
- Utilize level 3 as prime space for students (2)