- Floors: Level 4
- Start Date: April 2022
- Est. End Date: September 2022
DATES IN THIS DESCRIPTION ARE ESTIMATES. A suspended ceiling with standard tiles and LED lights will replace the existing ceiling and fluorescent lighting above the Asian Reference collection. The area will be brightened by replacing oak on walls and columns with painted wallboard and cherry accents.