Status: In Progress

In Progress
A new Help Desk for the Science/Engineering department will be created on Level 2 in this space. The individual study desks will be moved to another location and the shelf for featured books will be moved down the wall toward the door showing at the right of the photo.
In Progress
A suspended ceiling with standard tiles and LED lights will replace the existing ceiling and fluorescent lighting above the Snack Zone. Access through the area will be maintained throughout the project.
In Progress
When this project is complete, the Learning Commons will include both the northeast side (this project) and the northwest side of Level 3.
In Progress
An alcove in the Social Sciences area on Level 1 that used to have rental lockers is being converted into three fully-enclosed, sound-proof single-user study rooms.