This project will involve:
- Removing the existing drop-down waffle ceiling and lighting
- Updating HVAC in the area
- Converting fire sprinklers to recessed heads
- Installing new grid for suspended ceiling
- Installing new LED lighting fixtures
- Installing ceiling tiles
Access through the area will be maintained throughout the project. It will shift as project progress dictates.
Area before the project began Work area draped leaving North-South corridor Ceiling demo’ed inside the drape Some work also done in North-South corridor outside the drape