This project will involve:
- Removing the existing lockers
- Framing separate rooms
- Adding sound-dampening features
- Adding electricity, HVAC, and new recessed fire sprinklers
- Sheetrocking and painting
- Adding ceilings, and lighting
- Carpeting, furnishing, and adding doors
- Installing electronic scheduling panels outside the rooms
Rental lockers previously occupied the alcove After lockers were removed Demo of existing ceiling Exterior framing showing sound dampening wall construction View with former ceiling removed Interior framing HVAC components to be installed Rough electrical work done Some HVAC work above rooms completed Tie-ins to HVAC outside of room in progress Interior walls go to the deck to dampen sound transmission Another view of rough electrical work Sheetrocking completed Sheetrocking in progress Sheetrock has been taped and mudded Fire sprinklers and ceiling grid are in Rooms have been painted and door frames are in Electrical work completed inside rooms and they’ve been carpeted; doors waiting to be hung Doors installed but awaiting latches