This project, which expands the Learning Commons, will involve:
- Demolishing all interior walls to make the space contiguous
- Replacing the front wall with glass
- Changing the emergency exit to glass doors
- Necessary HVAC and fire sprinkler enhancements
- Replacing the ceiling and lighting
- Replacing the carpet
- Providing all new furnishings with a variety of table and seating types
- Creating several informal group study spaces
North wall gone; old interior walls visible Interior walls gone; new ceiling grid and lights installed “Clouds” (for pendant lights) above informal group areas visible Old carpet removed from north portion Short wall between group spaces and computer area begins New carpet laid and new glass emergency exit doors installed Wall displays and new furniture arrived; progress on computer area wall Tables and chairs for informal group spaces placed Wall painted for art Ceiling work continues Wall separator between group study and computer areas is finished Cherry cap at base of window wall is completed Additional furniture has arrived and is placed Computer carrels are being assembled on East side of the sapce View looking to the West