Oak Paneling Removal and Ceiling Renovation

In Progress
Old oak paneling is being removed. Walls will be patched and painted. The old drop down ceiling will be raised and new lighting will be installed.

About this Project

Consistent with our strategic plan, the south area of level two is being updated to provide better lighting and an improved aesthetic for student study space.

Updates

Ceiling removal

The drop down ceiling is being removed in preparation for new lighting and ceiling…

Oak paneling removal

Oak paneling has been removed from the walls on level 2 south…