This project will involve:
- Demolishing existing faculty research rooms and group study rooms
- Updating HVAC in the area
- Converting fire sprinklers to recessed heads
- Installing new grid for suspended ceiling (if necessary)
- Installing new LED lighting fixtures
- Covering exposed brick wall with sheetrock
- Painting sheetrock
- Replacing carpet
Current view on Level 4 when looking south from just inside the north staircase (obstructed sightline) Same view on Level 5 (open sightline)