A new Help Desk for the Science/Engineering department will be created on Level 2 in this space. The individual study desks will be moved to another location and the shelf for featured books will be moved down the wall toward the door showing at the right of the photo.
About this Project
This project will involve:
Design of a new Help Desk
Fabrication of the desk
Placement of the desk
Move of operations from the current desk to the new desk
Removal of the current Help Desk
Updates
July 22, 2021
Four projects currently underway
Four remodeling projects are currently underway that we hope will be done before or shortly after Fall 2021 semester…
January 20, 2021
Level 2 South Open
Construction in the south end of Level 2 is nearly complete. The old dark wood wall panelling and the…
November 4, 2020
New Windows on Level 3
Update, April, 2021: In response to requests from BYU students, the Library is remodeling the Learning Commons one level…
September 15, 2020
New offices for First Year Experience
Five new offices have been created for the First Year Experience area….
September 14, 2020
Receiving Department and Stacks Department have been completed
The stacks department is now moved into their new space. The mail room and supply room are fully operational….
September 14, 2020
Ceiling removal
The drop down ceiling is being removed in preparation for new lighting and ceiling…
September 14, 2020
Oak paneling removal
Oak paneling has been removed from the walls on level 2 south…
September 14, 2020
New offices
The new science offices are now complete….
September 14, 2020
Floor repair
New concrete to level out floor and prepare it for carpet….
September 14, 2020
New wall opening
New wall opening between south and central buildings…
September 14, 2020
Family History Classroom has been completed!
The Family History classroom now has new carpet, new furniture, and new glass walls….
September 14, 2020
Family History Glass Walls
The glass walls have been installed for the new Family History classroom….
September 14, 2020
Wall Removal in Music and Dance Area
The wall between the Music and Dance circulating collection and the Music and Dance computer and composition area has…
September 14, 2020
New arrangement for Music and Dance computer area and study space
The large computer and composition carrels for this area have been placed in between the pillars to allow for…
September 14, 2020
Finishing work is being completed in Book Repair and Conservation
Wood trim, paint, and cabinetry has been installed in Book Repair and Conservation….
April 13, 2020
Framing and electrical are underway
Office and workspaces are being framed. Electrical is being installed….